Overview

Our clients brief was to create a premium hospitality offering at Somerset Park, whilst providing additional seating and a covering over the North Terrace.

 

The proposal has been designed to improve the all round match day experience and to improve the day-to-day facilities for the club staff. The facility has been designed to be sympathetic to the context whilst optimizing views to the pitch from the new seats.

Location

Somerset Park, Ayr


Client

Ayr United FC


Budget

Undisclosed


Completion

2024


The design aims to retain the character of Somerset Park whilst helping to bring the stadium into the 21st century.

The new purpose built stand provides a hospitality suite, catering facilities, a business zone, a media room, welfare facilities & pie stands and level access. The hospitality area has also been designed to be zoned to allow it to be flexible to the needs of the club.

 

Working closely with the contractor and engineers in the early design stages has allowed us to create an efficient building, which optimizes structural systems and works closely with the site levels.

Pitch Corner
IMG 9812Xl (1)
Players+In+Front+Of+New+Stand+Copy
Aerial Sketch Future Of Somerset Park For Website

Topography and Sustainability

Due to the tricky site topography, deciding on levels was an important design driver in the process. The levels are governed by creating the optimal view of the pitch whilst ensuring there is level access to the hospitality and new stand.

 

The sustainability strategies adopted included no spoil to be removed from site, rainwater from the roof is harvested and used to water the pitch and air source heat pumps are used to heat and cool the building as efficiently as possible.

Sectional Perspective (1)
Process Drawings

Enclosing the stadium

The floor plan was developed to suit the varied needs of the club, community, spectators, and external groups. It has been designed with flexibility in mind and can adapt to suit the future needs of the club. The shape of the stand also creates a sense of enclosing the stadium, whilst the floor plan ensures each key room has a visual connection with the pitch and that the seated areas have the best possible views.

AL(00)04 Proposed Site Plan 01 01
Proposed Ground Floor 01
AL(00)21 REV07 Section Through Accessible Seating (V2)
Tunnel

Programme and Budget

Delivering the project within the allocated 12-month window was key for our client, to ensure minimum disruptions to their operations. Working closely with the contractor, sub-contractors and engineer allowed us to make efficient and economical decisions on-site, to ensure the project was delivered on budget.

DYA Ayrutd 3098
Entrance
DYA Ayrutd 3140

Sustainability and design. Hover or tap on the white dots on the above image to explore.

DYA Ayrutd 0482 Aerial

Sustainability Strategies

Rainwater from the roof is harvested and re-used to water the pitch, helping to conserve fresh water and minimize environmental impact.

Preserving Character

Somerset Park is not an all-seater stadium, it is a stadium where you are free to roam the terraces. We aimed to preserve that character by keeping the standing area of the North Terrace and putting the seats behind.

Sustainability and design. Hover or tap on the white dots on the above image to explore.

Outcome

The new facility is an exciting stepping stone for the club and the community. Somerset Park is now more accessible and open to a wider spectrum of fans than ever before. We are excited to see how the combined impact of the Hub and the North Stand will impact the club over the next 5-10 years. 

 

Graeme Mathie

Managing Director, Ayr United Football Club

The award-winning North Stand development is a gamechanger for Ayr United FC.  Having a bespoke and flexible hospitality space to use on match-days and throughout the week will make a significant difference to our ability to connect with numerous parts of our community.

Graeme Mathie

Managing Director, Ayr United Football Club

Project team

Staff member working over a computer in Denham Youd offices.

Steven Denham

Founder and Managing Director

Staff member laughing during conversation with a colleague in Denham Youd offices.

Colin Reynolds

Architect


Project collaborators

Ashleigh Ltd

Contractor

Clancy

Structural & Civil

WSP

MEP & Energy

Principal CDM & Safety Ltd

Principal Designer

Gartcarron Fire Engineering

Fire Engineering

Alan Graham & David Barbour

Photography